What Your TDS Log Says About Blowdown, and When Automatic TDS Control Saves Fuel
Your boiler TDS log and a measured feed TDS show how much blowdown the boiler gets and how much it needs. Automatic control saves fuel only on the gap; sometimes it only protects the boiler.
On this page
Most small boiler houses still blow down by habit: a valve opened for a minute or two, once or twice a shift. Whether that is too much or too little is already written down in two numbers most plants keep: the feed water TDS and the boiler water TDS in the log. Read together, they also say whether an automatic TDS controller would save fuel, or only keep the boiler safe.
Every example below comes from a real steam audit, with the names taken off.
1. One balance, run both ways
Whatever dissolved solids come in with the feed water must leave with the blowdown. At steady state:
- blowdown needed = steam × F ÷ (B − F), where F is the feed TDS and B is the boiler’s TDS limit, both in ppm.
The same balance runs backwards. Put your logged boiler TDS in place of the limit and it gives the blowdown the boiler is actually getting. The ratio of the two is simply (limit − F) ÷ (logged TDS − F).
One audit shows how much that tells you. The feed measured 40 to 50 ppm, the limit was 3,000 ppm and the boiler log read 1,500 to 2,000 ppm. The valve routine worked out at about 2,475 kg of blowdown a day, and the balance agrees: that much blowdown on 45 ppm feed holds the boiler near 1,570 ppm. The need was about 1,280 kg. The boiler was getting roughly twice the need, and the log alone would have said so.
2. Get the feed figure right first
F sits on top of the formula, so any error in it moves the answer in proportion. Three slips come up again and again.
- Make-up TDS used for feed TDS. The boiler sees the blend of make-up and returned condensate, and condensate carries almost no solids. If half your feed is returned condensate, the feed TDS is about half the make-up figure.
- A round number for a measurement. In the audit above, the sheet used 100 ppm where the feed measured 40 to 50, and put the need at 2,896 kg a day instead of about 1,280.
- Conductivity used as TDS. Conductivity in µS/cm is not ppm. In another audit a feed conductivity of 200 µS/cm went into the formula as 200 ppm; the plant’s own feed TDS was 100 ppm. The required blowdown doubled on paper, from about 1,240 to 2,571 kg a day.
All three inflate the need, and that matters more than it looks. An inflated need makes heavy manual blowdown look justified and hides the over-blowing a controller would stop. If you dose a non-volatile oxygen scavenger, add the solids it puts into the feed too; an open feed tank at 95 °C still needs one.
3. When automatic control saves fuel
It saves fuel when the blowdown you actually give is well above the need, and the saving is only that gap. Each kilogram not blown down keeps its heat above the cold make-up that would replace it: at 10 bar g with make-up at 30 °C, about 155 kcal per kilogram, from the steam tables.
The clearest case is a boiler on DM water at 6 ppm. With feed that clean the need is tiny, about 0.2 % of the steam; the audit put it at 137 kg a day. The plant opened a manual 2-inch valve for three minutes a day, about 2,160 kg a day, or roughly 3.5 % of its steam. The whole saving, about 2,000 kg of blowdown, some 45 litres of furnace oil and 2 kL of DM water a day on the audit’s own working, came from stopping that one oversized shot.
That audit did not print its feed, limit and steam figures; worked backwards, the 137 kg fits 6 ppm feed, a 3,000 ppm limit and the plant’s average load. It also valued the water at 180 °C where the boiler ran at about 190 °C, so the saving was, if anything, about 7 % understated. Print the inputs, and value the water at the boiler’s real pressure.
On good feed water, the saving is only the over-blowing you stop.
4. When it only protects the boiler
Two situations turn the fuel case round.
- Manual blowdown already close to the need. The conductivity audit above claimed 4,620 kg a day of manual blowdown. Its own log read 2,300 to 3,500 ppm. Had the boiler really blown 4,620 kg a day on 100 ppm feed, it would have sat near 880 ppm. The log proved the manual routine was already near the need, so a controller would save little fuel.
- Boiler already above its limit. At another plant the drum read 7,600 ppm (one reading). If that is the steady state, holding 3,500 ppm on 100 ppm feed raises blowdown from about 1.3 % to 2.9 % of the steam. The controller costs fuel. What it buys is protection against foaming and carry-over, and it should be justified on that.
Manual shots also leave peaks: in one boiler house TDS swung 500 to 5,200 ppm against a 3,500 ppm maximum. Taking those off is protection, not a fuel saving.
5. Check the controller against a sample
A controller is only as good as its probe. In that same boiler house all three boilers had automatic TDS control, and none worked: one did not read TDS at all, and another showed 410 ppm when the boiler water was 2,800 ppm. The operators had stopped trusting them and gone back to blowing down by hand, twice a shift. Test the display against a grab sample regularly, and log both.
6. Lower the feed TDS, then size the recovery
The biggest lever on the need is F itself, and returned condensate pulls it down. After its retrofit, the customer at the Bursa corrugator reported about 80 % less feed water and chemicals. When a condensate project lowers F, recompute the blowdown need, and do not book the drop as the controller’s saving.
Then size any flash vessel and heat exchanger on the controlled blowdown, not today’s. The lesson on blowdown and TDS control covers the recovery side, and seven audit findings puts blowdown among other quick checks.
What we need from you
Send us your boiler pressure and average steam rate (not the rating), a measured feed TDS with its unit (ppm or µS/cm), a week of boiler TDS readings, your blowdown routine (valve size, seconds, blows per shift, shifts a day), the make-up temperature and condensate return, and, if you have a controller, its reading next to a lab sample. We will tell you whether control would save fuel, protect the boiler, or both.
FAQ
How do I find my actual blowdown without measuring it?
Run the TDS balance backwards: actual blowdown is about steam × feed TDS ÷ (logged boiler TDS − feed TDS). Use a measured feed TDS in ppm and several boiler readings across the day, not one spot sample.
Does automatic TDS control always save fuel?
No. It saves only the over-blowing it stops. If manual blowdown is already close to the need, the fuel saving is small. If the boiler runs above its limit, control raises blowdown and fuel, and its value is protection against foaming and carry-over.
Can I put a conductivity reading straight into the formula?
No. Conductivity in µS/cm is not TDS in ppm. Convert it with the factor for your water, often about 0.5. In one audit, conductivity entered as TDS doubled the required blowdown on paper.