A steam system audit that ends in numbers you can act on
We start at the process: where and how each user takes steam, and what that does for throughput and efficiency. Then we measure the system back to the boiler house and report each loss in kg/h of steam and in fuel, with the fix that brings it back into use.

The questions
What a plant head asks about steam
- What does a tonne of steam cost us, fuel to drain?
- How much of the boiler's steam reaches the process, and where does the rest go?
- Which traps are passing steam, and what is each one costing every day?
- How much condensate and flash steam are we sending to drain or venting to air?
- Where is the next saving, and what will it take to get it?
What we audit
Five areas, in steam-flow order
The audit follows the steam: made in the boiler house, carried by the distribution, released at the traps and the use points, returned as condensate.
-
Boiler house
Steam-to-fuel ratio from your meters and logs against the design, blowdown rate from the TDS readings and the heat it carries away, feed-water temperature and deaeration.
-
Distribution
Line sizes and lengths against the flows, pressure drop, drip legs and mains trapping, air venting, surface temperatures of the insulation, leaks and passing bypasses.
-
Steam traps
Every trap tagged and tested with Senseven Trap Sense, with no production stop: type, size and application against the duty, and the steam loss of each failed trap.
-
Use points and controls
Steam use per consumer, the pressure-reducing stations (PRS) and temperature controls, the metering, and the heat balance across the main users.
-
Condensate and flash
How much condensate comes back, at what temperature and pressure, what flashes off and where it goes, and what a flash vessel, a pump or a variable-nozzle Jetomat® would recover.
Levels
Three levels, by how deep you want to go
Pick the level that fits the question. A walk-through finds the big items. A detailed audit measures them. An engineering study turns one of them into a project.
| Level | Time on site | What you get |
|---|---|---|
| Walk-through | 1 day | A short report of the main losses seen and measured on the day, ranked, with the next step for each. |
| Detailed audit | 3-5 days | Every area measured and every trap tested; a full report with the heat balance and the ranked list of fixes, presented to your team. |
| Engineering study | Set by the scope | One finding taken to a project: P&ID, sizing, layout and the bill of materials your purchase team can float. |
The report follows within a week of the site work, then a half-day presentation to your team.
How it runs
Six steps, from the first call to the measured saving
The same six steps at every level, scaled to it.
Scope and data request
We agree the level and the areas, and send a questionnaire: boilers and pressures, fuel, steam users and their duties, trap count, the drawings you have.
Desk review
We read your drawings and a year of fuel and production data before anyone comes to site, so the site days go on measurement, not orientation.
Site measurement
We test the traps with Senseven Trap Sense, read surface temperatures with an infrared thermometer, measure condensate and flash by timed collection with a calibrated beaker and scale, check boiler TDS, and read your plant's own meters and DCS trends. Your engineer walks every line with us.
Analysis
A heat balance of the steam system, the loss behind each finding in kg/h and in fuel, and the fix for each with what it costs and what it returns.
Report and presentation
The written report first, then a half-day with your team to go through the ranked list and agree what moves first.
After the audit
When a fix is built, we come back, measure again and report the saving against the baseline.
The report
What the report contains
Written for the plant head and the utility engineer both: the first page is the list, the rest is the evidence.
- Summary: the ranked list of fixes, each with its steam and fuel saving and its cost class
- The steam system as found, drawn as a P&ID, and a heat balance of where the steam goes
- Boiler efficiency from the metered steam and fuel, with the readings used
- The trap register: every trap tagged, its test result and its loss
- Distribution findings with photos: sizing, drainage, insulation, leaks
- Condensate and flash: quantities, temperatures, and the recovery scheme
- Safety observations, listed apart from the energy items
- The measured data sheets, so your team can repeat the readings
Proof
A trap audit, measured
- 190 traps
- tested in 4 days
- 45 faulty
- 24% of the traps tested
At a chemical plant in October 2026 we tagged and tested 190 steam traps in four days with Senseven Trap Sense. 45 were faulty, 33 of them leaking live steam. Each one is in the plant's register with its loss.
Read the case studyAfter the audit
From the ranked list to the plant
An audit finding becomes a project. These are the four routes most findings take.
-
Piping projects
Steam and condensate lines designed, approved under IBR, built and commissioned.
Piping projects -
Jetomat® thermocompressor
Flash or low-pressure steam recompressed to a usable pressure with a variable-nozzle Jetomat®, made by Baelz.
Jetomat thermocompressor -
Condensate & flash recovery
Flash vessels, pumps and return lines that bring the condensate and its heat back to the boiler house.
Condensate & flash recovery -
Trap & valve inspection
Trap and valve testing with Senseven Trap Sense and Valve Sense, trap by trap, tagged, with no production stop.
Trap & valve inspection
Engineering only
Engineering services on their own
You may not need an audit, or the audit is done and you need the drawings. We do the engineering alone.
- P&IDs of steam and condensate systems
- Pipe sizing on velocity and pressure drop
- Stress analysis for hot lines
- Isometrics and IBR drawings for approval
- Feasibility studies for flash and condensate recovery
- Heat-pump feasibility studies
FAQ
Steam audit questions
Do we need to stop production for the audit?
No. The measurements are taken with the plant running; that is the point of them. Trap testing with Senseven Trap Sense needs no production stop. We do need an engineer who knows the plant to walk with us, and access to the boiler house log and the fuel records.
Will the report just recommend your products?
No. The report lists what the measurements show and the fix for each item: insulation, drainage, a trap change, a flash vessel, a pipe re-route, a control. Where a variable-nozzle Jetomat® is the right answer we say so, and we say what it recovers. Insulation, drainage and trap fixes are your own team's work, and we list them the same way.
Is this a statutory energy audit?
No. It is a steam-system engineering audit, with measurements and a report your team can act on. If your plant is a designated consumer under the Energy Conservation Act, its statutory audit is a separate exercise by an accredited energy auditor.
How is the audit priced?
A fixed fee, quoted after we see your plant data. The questionnaire comes first, so the quote fits the plant and the level you pick.
What data do you need before you come?
Boiler capacities and pressures, the fuel bill and production for a year, the steam users and their duties, the trap count, and any P&ID or layout you have. Our questionnaire lists it.
Can you also build what the report recommends?
Yes. Piping projects, Jetomat® installations and condensate and flash recovery systems are our own work, turnkey or engineering only. You are also free to build from our drawings with your own contractor.
Want the numbers for your steam system?
Send us your boiler capacities, fuel and steam data and the drawings you have. We will propose the level and the scope.